
Another area where Transcote has excelled is in the area of stacker/reclaimer painting and ongoing maintenance where corrosive conditions make protective coatings essential.
Stacker/Reclaimer at BMA Hay Point Services
Transcote were involved at the construction stage of this reclaimer ensuring the protection offered was appropriate to withstand the atmospheric and physical conditions of the area. International Paint Systems utilising Interzinc and Intergard products were used for the job.
The client was Thissen Krupp.
Subsequently Transcote has retained the maintenance contract for the reclaimer.
The client is Hay Point Services
Reclaimer – Anglo Coal Dawson Mine
Similar again to the above mentioned projects using a combination of International paints.
The client was Schade.
Stacker/Reclaimer at Abbott Point
Similar example again, with the client being Voest Alpine.
Stacker/Reclaimer at Dalrymple Bay
Similar to the Hay Point job mentioned, involvement has been continuous since the construction stage with similar protective coating systems (Interzinc and Intergard) being applied. Transcote continues to be a preferred service provider on these difficult jobs where attention to detail and experience are critical.
The client is G and S Engineering.